Wednesday, 29 November 2023

Leaving Withybed Moorings

Today's Canal : Worcester and Birmingham

After a long wait whilst the land slip was being repaired just south of Shortwood Tunnel, eventually at the end of last week it was announced that navigation would resume at the end of last week. Given the scale of the task, that does seem to be good progress and a bot faster than originally suggested. However, we could not leave instantly (!) as Christine had an appointment at Salisbury for a routine ear check on Tuesday afternoon.

That meant the the earliest departure would could manage was 9 am today although we did as much as possible of the packing and car loading yesterday. We were away as planned and had a good run up to Swindon, across to the M5 and thence to Alvechurch. We stopped first at the bridge by Alvechurch Marina and the railway station, just to check on mooring space for unloading. Just as well we did check as there was no room at all! Most of the visitor mooring was taken up by pans that CaRT had been using to remove the landslip spoil.

At Withybed we loaded up a trolley and a wheelbarrow, about three quarters of what we needed to unload, and walked around to where our boat had been moored - right at the far side! All seemed to be well although the credit on the electricity had expired, but going by the State of Charge it must have been very recent.


By midday we were able to cast off and cruise across to the service wharf to add a bit of fuel to our tank as well as to retrieve out boat keys - the annual RCR service had been done whilst we were away. Both marinas were very helpful and pleasant, getting us out of our difficulty with having to leave the boat and return home. Thanks everyone and we recommend them both for their service.



Finally we were able to commence the remaining part of our 'Back to Base' trip that had been frustrated by the land slip. It was a bright and sunny day even if, when out of the sun, it was really rather chilly. It is definitely turning into winter. 

Christine drove the car to the station car park so that Mike can come back by train from Droitwich to collect it at the end of this trip. Mike picked her up at Bridge 69, close to the station.


ABC are continuing to update their fleet with several new boats nearing completion. Some already named and indicate that they are for Kings Orchard but others are still to be sign written.



About 20 minutes later the entrance to Shortwood Tunnel came into sight. From this end we could not yet see any sign of the repairs.





However as soon as we emerged back into daylight we could see what has been behind our delay. As we understand it, trees on the steep bank to the tunnel portal were loosened by storm conditions and then excess surface water running down the towpath cause the land to slip into the canal. CaRT (with their contractors) have removed all of the spoil from the canal and re-opened the navigation. Obviously this was a priority but it seems that they have yet to come up with a plan for the bank, For the time being, large bags (of aggregate?) have helped to stabilise the bank but as yet the towpath remains unusable. The emergency drainage has been left in place to help prevent further damage from any more winter storms.


We continued on  towards Tardebigge with yet another tunnel to transit. It was still very sunny but we paused on the lock landing for Tardebigge Top Lock just long enough to have a quick, but late, lunch.



Still only a bit after 2.30 but the temperature was dropping quickly so we dropped down the lock to the visitor moorings in the pound below. These have rings to tie up to (those above the lock do not) and also this will give us a little bit more time to reach the bottom of the flight before dark tomorrow - sunset is now just before 4.

3.5 Miles - 1 Lock

No comments:

Post a Comment