Today's Canals - Main Line, Soho Loop, Wednesbury Old, Walsall, Tame Valley, Rushall
It was raining as we set off after Andrew had made an expedition to the nearest full Tesco store - he returned with croissants and other pastries which kept us going between meals!
At Rotten Park Junction there is a cross roads where the winding original liner crosses over the New Main Line which was built as straight as possible. The Icknield Port Loop went left under the decorated bridge but we turned right under the more mundane railway bridge.
Half way around the loop is Hockley Port where another canal arm linked in. A short section is retained for a community of residential boats.
Towards the end of the loop we passed HMP Winson Green. A prison was first built on this site in 1849 adjacent to Winson Green Asylum. The splendidly built administration block is all that remains of the hospital that was later developed from the asylum. That link stays on with the name of one of the canal bridges.
Who was he? Did he escape?
Shortly after passing the prison we returned to the main line.
The Main Line is often very straight. Just before passing under the motorway and the Old Main Line (which ran at a higher level) there are two bridges that connect nowhere on either side. Originally they linked parts of Spon Lane Glass Works, a huge factory that developed on both sides of the canal. As the photo shows, a level crossing on the main electrified line would not be a good idea now!
The towpath is being resurfaced, maintaining the standard for a through cycle route. Unfortunately the works mean that at the moment cyclists have to find an alternative route!
Further on we passed a site where the towpath materials are being loaded onto boats to be taken along the canal.
We continued along the Main Line until Pudding Green Junction where we turned off along the Wednesbury Old Canal which then runs into the start of the Walsall Canal and the the eight Ryders Green Locks. Most of the flight is a straight run with very short pounds in between.
Large piles of wooden pallets are stored beside Lock 2 - alas one had fallen off and was blocking the lock so had to be pulled out before we could pass through.
After the locks we continued to Doebank Junction where there is a full set of facilities. We stopped thinking that we might have lunch here but eventually opted to have lunch on the go as the next section, the Tame Valley Canal, is very straight without any locks.
We felt very superior to look down on the motorway where road works and lane closures meant that there was slow moving traffic in one direction.
At Rushall Junction we turned northwards, a route that we have not taken since 2008.
By the time we arrived at the bottom of the flight - seven together, then a longer pound before the final two locks to the top. At this stage it was sunny and remarkably - given the weather of the past few days - quite warm.
As we travelled between locks we realised that we had picked up some rubbish on the prop but left it until we reached the top of the first part of the flight. Clearing it, which took both Andrew and Mike, at different stages, over half an hour to clear.
As we continued on the longer pound to the top two locks we could hear the sound of thunder and saw the occasional flash of lightning. Whether it would pass to one side of us was startlingly answered just before we arrived at the top two locks. A major hail storm was so painful that we left the boat to drift whilst we took shelter until the worst of it was over and we could continue into the next lock
As we arrived at Longwood Junction above the locks we spotted a short visitor mooring with one boat already moored but enough room for another. Any thoughts of going further quickly disappeared as we succumbed to temptation and the chance to dry out.
A little later there was a most splendid rainbow.
14.8 Miles - 17 Locks
Tuesday, 3 April 2018
Monday, 2 April 2018
Birmingham
Today's Canals - Worcester and Birmingham, BCN
The weather forecast for today given a couple of days ago included a yellow warning of snow. We awoke wondering what we might see outside but by the time we awoke it had all been downgraded to a simple wet and chilly day, very grey and overcast!
Very quickly after we set off the surrounding land became much higher than the canal so that the construction entailed cutting quite deeply into the ground.
As a result there are several places where ground water enters the canal - a bonus for the original company as it meant a saving on the water they needed to produce (expensively) from reservoirs. The number of inflows and outflows must make the water supply computer model so very much more complex than most people realise. This particular torrent of water looked very mu h as if it was an 'unofficial' source and quite recently formed, judging by the look of the ground it was running over.
However, the similar inflow just before the Wast Hill tunnel portal comes down a solidly constructed channel.
Before long we passed through Kings Norton Junction - where the Stratford Canal goes off to the right.
Shortly after the junction we spotted this once-splendid industrial building. We have not found out much about it but it seems that there were once several mills on this site. This may well have been Sherborne Paper Mill.
The route into Birmingham continues on the same level - so we had no locks to negotiate today. We had to follow much slower boats several times, the first one in the long Wast Hill tunnel. However, this boat appeared to change steerer half way through after running into the tunnel wall. The new steerer took a rather faster pace - which is how to travel through a tunnel best: too slow and the boat frequently goes off line. Somewhat later they did kindly pull to one side to allow us to pass. However we then caught up a hire boat which after quite a distance pulled in to moor.
Edgbaston Tunnel is the site of what were controversial works when first announced. Previously the tunnel was two-way with a narrow towpath. However, the number of boats using this route is not high (today may well have been a record!) but the towpath is well used by walkers and cyclists. As a result a scheme was devised to widen the towpath meaning that the tunnel (which takes all of just over a minute to pass through) is now one-way working. During the construction the towpath has had to be closed for quite a length but notices were posted at various places from some way back.
Finally we followed a boat towing a short cruiser. They were not greatly skilled and, as they were using a single long line with no steerer on the towed boat, the cruiser frequently went well off course.
We stopped at the Mailbox service facility just long enough to fill up with water and to empty the elsan - the towing boat had gone a little ahead and then turned around and was now waiting to use the water point so we did not stay longer than necessary.
Next came Worcester Bar, a former transshipment point between the two canals that met here - as signs still record.
In front of the ICC we rounded the main junction - variously named but more often today called Farmers Bridge - with some trepidation about finding a mooring as the section between the Mailbox and the Bar was pretty much full.
However we soon saw, to our amazement only one other boat already there! However, by the end of the cruising day almost all of the space was filled up.
After lunch we walked into the city centre, firstly to buy a replacement rapid charger which was also left behind at the hotel, and then for Christine to get Andrew' advice regarding a replacement for her aging iPad, which like others of us is gradually slowing down. After looking in PCWorld at the choice between another iPad and an Android or other alternative, she was not totally convinced but the consensus was that another Apple was possibly he way to go. However, the choice here was not straightforward. As a result we went on to New Street and the Apple Store, housed in a cavernous space once a major bank building. Here she found more in depth help from a salesman and also that there was a newer model more suited to her needs and budget. After a short adjournment to debate the issues, she soon returned and found the same salesman to complete a purchase. However, we then went back to PCWorld for a wireless keyboard.
Back at the boat it took her and Andrew some little while to sort how to start up and transfer stuff from the old tablet.
9.32 Miles - 0 Locks
The weather forecast for today given a couple of days ago included a yellow warning of snow. We awoke wondering what we might see outside but by the time we awoke it had all been downgraded to a simple wet and chilly day, very grey and overcast!
Very quickly after we set off the surrounding land became much higher than the canal so that the construction entailed cutting quite deeply into the ground.
As a result there are several places where ground water enters the canal - a bonus for the original company as it meant a saving on the water they needed to produce (expensively) from reservoirs. The number of inflows and outflows must make the water supply computer model so very much more complex than most people realise. This particular torrent of water looked very mu h as if it was an 'unofficial' source and quite recently formed, judging by the look of the ground it was running over.
However, the similar inflow just before the Wast Hill tunnel portal comes down a solidly constructed channel.
Before long we passed through Kings Norton Junction - where the Stratford Canal goes off to the right.
Shortly after the junction we spotted this once-splendid industrial building. We have not found out much about it but it seems that there were once several mills on this site. This may well have been Sherborne Paper Mill.
The route into Birmingham continues on the same level - so we had no locks to negotiate today. We had to follow much slower boats several times, the first one in the long Wast Hill tunnel. However, this boat appeared to change steerer half way through after running into the tunnel wall. The new steerer took a rather faster pace - which is how to travel through a tunnel best: too slow and the boat frequently goes off line. Somewhat later they did kindly pull to one side to allow us to pass. However we then caught up a hire boat which after quite a distance pulled in to moor.
Edgbaston Tunnel is the site of what were controversial works when first announced. Previously the tunnel was two-way with a narrow towpath. However, the number of boats using this route is not high (today may well have been a record!) but the towpath is well used by walkers and cyclists. As a result a scheme was devised to widen the towpath meaning that the tunnel (which takes all of just over a minute to pass through) is now one-way working. During the construction the towpath has had to be closed for quite a length but notices were posted at various places from some way back.
Finally we followed a boat towing a short cruiser. They were not greatly skilled and, as they were using a single long line with no steerer on the towed boat, the cruiser frequently went well off course.
We stopped at the Mailbox service facility just long enough to fill up with water and to empty the elsan - the towing boat had gone a little ahead and then turned around and was now waiting to use the water point so we did not stay longer than necessary.
Next came Worcester Bar, a former transshipment point between the two canals that met here - as signs still record.
In front of the ICC we rounded the main junction - variously named but more often today called Farmers Bridge - with some trepidation about finding a mooring as the section between the Mailbox and the Bar was pretty much full.
However we soon saw, to our amazement only one other boat already there! However, by the end of the cruising day almost all of the space was filled up.
After lunch we walked into the city centre, firstly to buy a replacement rapid charger which was also left behind at the hotel, and then for Christine to get Andrew' advice regarding a replacement for her aging iPad, which like others of us is gradually slowing down. After looking in PCWorld at the choice between another iPad and an Android or other alternative, she was not totally convinced but the consensus was that another Apple was possibly he way to go. However, the choice here was not straightforward. As a result we went on to New Street and the Apple Store, housed in a cavernous space once a major bank building. Here she found more in depth help from a salesman and also that there was a newer model more suited to her needs and budget. After a short adjournment to debate the issues, she soon returned and found the same salesman to complete a purchase. However, we then went back to PCWorld for a wireless keyboard.
Back at the boat it took her and Andrew some little while to sort how to start up and transfer stuff from the old tablet.
9.32 Miles - 0 Locks
Sunday, 1 April 2018
Hopwood
Today's Canal - Worcester and Birmingham
It was a bright and sunny morning as we prepared to set off, with the 30 locks of the Tardebigge flight ahead of us, not to mention the last of the Stoke flight for starters. In fact the pound between the Stoke and the Tardebigge locks is shorter than some mid-flights pounds.
Just after the first lock we spotted this windmill across the fields. So far we have not learnt anything about it - in fact we do not recall seeing it before. It looks suspiciously new and is not marked on any of the maps we have looked at. Google also drew a blank. Mystery!
Stoke Top out of the way we could set our timer to see how long it would take to clear the flight. However, as we rounded the corner we could see that another boat had just set off, with another coming along just behind us. Such a close convoy meant that we could not set the next lock before leaving the previous one as we soon caught up with this boat. This added perhaps a minute or so to the time for each lock. Our log records that we entered the bottom lock at 9:35.
There are several lock cottages dotted along the flight, not all of them easily accessible by road, as well as the usual ones at top and bottom.
Locks 31 and 32 have very slippery coping stones - as Mike quickly discovered. One of the crew from the following boat remarked that he had almost slid into the lock at the first. Only afterwards did we see that warnings signs have been fixed to the lock beams which we do not think were there last year - perhaps there has been an incident or a complaint!
The locks continue unremitting - a couple have large radio installations - GCHQ branching out? Just in case there is an invasion up the Severn and along the canal into Birmingham?
Andrew has recently bought a new camera, one that takes 360 pictures. We have had to get used to the fact that an arm raised is not necessarily a signal but a camera shot in progress!
Someone has decorated all of the locks with a small knitted flower. They look very new - we did not see them when we walked along here during the ice age few weeks back. Perhaps they are an Easter gift to all boaters and walkers?
Gradually we rose up to the level of the reservoir which built to feed the whole of the Worcester and Birmingham canal.
A major bank repair was carried out over the winter - which what we came to look at on our walk. The contractors have done a good job at clearing up - this was the main compound where mortar and concrete were being prepared.
The repair was describe as a Rotating Wall, presumably as the whole wall was collapsing into the water at the foot of the reservoir embankment. Now that the pound has been refilled it is hard to see all the hard work that went into the repair - no doubt most of the visitors walked by without realising what had to be done.
This lock cottage is barely visible from the towpath - even more so when the trees are in full leaf. Actually there is quite a substantial house at a level below the canal.
Just above the penultimate lock stands the former Engine House, now converted into dwellings. It originally pumped water from the reservoir a little lower down but ceased operation in 1914 when water was fed from the Upper Bittell Reservoir by gravity.
And so we reached the top lock! The log records our departure at 13:56 some 4 hours and 21 minutes after starting. Given that we were closely following another boat this was quite respectable.
We then pulled in to the wharf where there are all the usual boater's services. Whilst the water tank filled, we had our lunch - much anticipated.
Eventually we set off once more and passed through the Tardebigge and Shortwood Tunnels. As we approached the latter we could see lights coming towards us, but since this is a two-way tunnel we entered. They turned out to be three canoeists, one on a stand-up paddle board. The experience did little to convince us that allowing unpowered craft into major tunnels is not a great idea (there are signs forbidding it but this had been a recent subject of controversy )
We were now on a long level, right into the centre of Birmingham, not that we were intending to go that far tonight!
A new marina is nearing completion just after Bridge 61. However there was no information on display about either what it is to be called where to enquire about booking a mooring. No doubt that will soon change.
We later worked out that this is Withybed Moorings. Their website shows that it has been a long haul (over 15 years since they first started on planning!) to get to this point and that they re now hoping to remove the final barrier and admit boats at the Spring Bank Holiday.
We continued a little further as we found no useful space to moor at our planned target of Lower Bittell Lake. We eventually pulled in just beyond the official visitor moorings at Hopwood we spurned the useful rings in favour of a spot where we could expect a tv signal!
8,1 Miles - 31 Locks
It was a bright and sunny morning as we prepared to set off, with the 30 locks of the Tardebigge flight ahead of us, not to mention the last of the Stoke flight for starters. In fact the pound between the Stoke and the Tardebigge locks is shorter than some mid-flights pounds.
Just after the first lock we spotted this windmill across the fields. So far we have not learnt anything about it - in fact we do not recall seeing it before. It looks suspiciously new and is not marked on any of the maps we have looked at. Google also drew a blank. Mystery!
Stoke Top out of the way we could set our timer to see how long it would take to clear the flight. However, as we rounded the corner we could see that another boat had just set off, with another coming along just behind us. Such a close convoy meant that we could not set the next lock before leaving the previous one as we soon caught up with this boat. This added perhaps a minute or so to the time for each lock. Our log records that we entered the bottom lock at 9:35.
There are several lock cottages dotted along the flight, not all of them easily accessible by road, as well as the usual ones at top and bottom.
Locks 31 and 32 have very slippery coping stones - as Mike quickly discovered. One of the crew from the following boat remarked that he had almost slid into the lock at the first. Only afterwards did we see that warnings signs have been fixed to the lock beams which we do not think were there last year - perhaps there has been an incident or a complaint!
The locks continue unremitting - a couple have large radio installations - GCHQ branching out? Just in case there is an invasion up the Severn and along the canal into Birmingham?
Andrew has recently bought a new camera, one that takes 360 pictures. We have had to get used to the fact that an arm raised is not necessarily a signal but a camera shot in progress!
Someone has decorated all of the locks with a small knitted flower. They look very new - we did not see them when we walked along here during the ice age few weeks back. Perhaps they are an Easter gift to all boaters and walkers?
Gradually we rose up to the level of the reservoir which built to feed the whole of the Worcester and Birmingham canal.
A major bank repair was carried out over the winter - which what we came to look at on our walk. The contractors have done a good job at clearing up - this was the main compound where mortar and concrete were being prepared.
The repair was describe as a Rotating Wall, presumably as the whole wall was collapsing into the water at the foot of the reservoir embankment. Now that the pound has been refilled it is hard to see all the hard work that went into the repair - no doubt most of the visitors walked by without realising what had to be done.
This lock cottage is barely visible from the towpath - even more so when the trees are in full leaf. Actually there is quite a substantial house at a level below the canal.
Just above the penultimate lock stands the former Engine House, now converted into dwellings. It originally pumped water from the reservoir a little lower down but ceased operation in 1914 when water was fed from the Upper Bittell Reservoir by gravity.
And so we reached the top lock! The log records our departure at 13:56 some 4 hours and 21 minutes after starting. Given that we were closely following another boat this was quite respectable.
We then pulled in to the wharf where there are all the usual boater's services. Whilst the water tank filled, we had our lunch - much anticipated.
Eventually we set off once more and passed through the Tardebigge and Shortwood Tunnels. As we approached the latter we could see lights coming towards us, but since this is a two-way tunnel we entered. They turned out to be three canoeists, one on a stand-up paddle board. The experience did little to convince us that allowing unpowered craft into major tunnels is not a great idea (there are signs forbidding it but this had been a recent subject of controversy )
We were now on a long level, right into the centre of Birmingham, not that we were intending to go that far tonight!
A new marina is nearing completion just after Bridge 61. However there was no information on display about either what it is to be called where to enquire about booking a mooring. No doubt that will soon change.
We later worked out that this is Withybed Moorings. Their website shows that it has been a long haul (over 15 years since they first started on planning!) to get to this point and that they re now hoping to remove the final barrier and admit boats at the Spring Bank Holiday.
We continued a little further as we found no useful space to moor at our planned target of Lower Bittell Lake. We eventually pulled in just beyond the official visitor moorings at Hopwood we spurned the useful rings in favour of a spot where we could expect a tv signal!
8,1 Miles - 31 Locks
Saturday, 31 March 2018
Stoke Prior
Today's Canals - Droitwich, Worcester and Birmingham
Time at last to leave the marina at Droitwich was has been home to nb Alchemy for this winter - and a good home it has been.
Alas, Christine discovered last night that we had left behind at the hotel her iPad charging lead. So she persuaded Andrew to drive her into town to track down a replacement as well as pick up a paper. There had been some debate about whether it was better to do this before setting off or to wait until later in the morning when we passed through on the canal. However, last night a gas bottle ran out and we wanted to buy a replacement before leaving as, with our plan being to go down the River Severn, supplies are less frequent.
So they went into town leaving Mike to mover the boat around to the service point, replace the gas bottle and empty the elsan. By the time he had just about finished the other two returned. On the way back they stopped off to take a look at the canal under the M5 as well as the short river section. They could see that the marker showing the head room through the tunnel was not enough and also that the river looked in angry mode. Mike had also received a similar message from the marina office but with the extra that the locks were chained up to prevent anyone trying unwisely to pass under the motorway and the getting stuck.
So, we now knew that we would have to turn left out of the marina instead of the planned right. Whilst we knew that the River Severn might also be a problem, we had planned to go at least down that far just to see, even if it meant going upstream to Stourport instead of down to Gloucester, which is what we - or at least Mike - had planned to do.
Immediately we came to the three Hanbury locks where a couple of lock keepers were on duty to help boaters through - and to make sure that they operated the side ponds (Mike forgot on the first one as he was really thinking about alternative routes as was duly reprimanded!) What we did learn, however, was that by now Diglis locks at Worcester were now closed. This reduced our options from at least four down to one. How easy does that make the choice? We also had to break the bad news to a hire boat that was on their way down the Droitwich to complete the short ring on a four day hire from Worcester.
The morning was tolerably cool and dry but by the time we turned left at Hanbury Junction rain arrived and the temperature dropped markedly for the rest of the day, although the rain was at least intermittent.
It was not long before we arrive at the bottom f the long rise of locks from here to the Birmingham level - although officially they are divided into the Astwood, Stoke and Tardebigge flights. The pounds between the flights are barely different from those in the middle.
At least there was plenty of water coming down the overflows.
Above the Astwood locks we moored up to a new section of bank to have our lunch. Christine was pleased that she had taken time last evening to prepare hearty soup which went some way to warming us up again.
At the bottom end of the Stoke Locks is where the Salt Works once stood. The land has been derelict for a while but a new and large housing development project is underway with considerable works being done to prepare the land. No doubt treatment of the adverse effects of long chemical working will not be straightforward.
We were disappointed to see that the Stoke Works Pump House (which we featured in our blog in 2014) appears to have been completely demolished. We had understood that this was the last remaining building from the once substantial Salt Works and was being preserved.
It was clear that we would not attempt the Tardebigge flight tonight and so we tied up for the night in the pound below Stoke top lock - to avoid being outside the popular pub just above that lock. Even so we had to be careful about the boat leaning at an angle if too many lockfuls of water were taken out.
It was still only just after 3.30 when we were tied up and fire lit so Mike and Christine opted to walk to the nearby Stoke Prior parish church to check out what time there might be a service tomorrow, Easter Day. (All our previous investigations around where we had hoped to be were now irrelevant!) Alas, when we arrived at 4.05 the church was already locked (it is normally open between 10 and 4) and we eventually discovered that tomorrow's service is not until 6 in the evening! Not much help for us.
In the porch is an old wooden cross which is inscribed in memory of Charles steer who was the first chairman of the newly merged company of GKN, having previously been in charge of Nettlefolds which was the last of the companies to join this giant engineering and manufacturing company. Charles Steer established a 'rest home' in Stoke Prior for former employees. A timely reminder given that GKN has only just fallen to a predatory takeover from a firm that specialises in breaking up old established businesses in order to make more profit from them. Ironically, when GKN was originally formed it was the result of various mergers and takeovers during which many workers either lost their jobs or had to move.
4.3 Miles - 14 Locks
Time at last to leave the marina at Droitwich was has been home to nb Alchemy for this winter - and a good home it has been.
Alas, Christine discovered last night that we had left behind at the hotel her iPad charging lead. So she persuaded Andrew to drive her into town to track down a replacement as well as pick up a paper. There had been some debate about whether it was better to do this before setting off or to wait until later in the morning when we passed through on the canal. However, last night a gas bottle ran out and we wanted to buy a replacement before leaving as, with our plan being to go down the River Severn, supplies are less frequent.
So they went into town leaving Mike to mover the boat around to the service point, replace the gas bottle and empty the elsan. By the time he had just about finished the other two returned. On the way back they stopped off to take a look at the canal under the M5 as well as the short river section. They could see that the marker showing the head room through the tunnel was not enough and also that the river looked in angry mode. Mike had also received a similar message from the marina office but with the extra that the locks were chained up to prevent anyone trying unwisely to pass under the motorway and the getting stuck.
So, we now knew that we would have to turn left out of the marina instead of the planned right. Whilst we knew that the River Severn might also be a problem, we had planned to go at least down that far just to see, even if it meant going upstream to Stourport instead of down to Gloucester, which is what we - or at least Mike - had planned to do.
Immediately we came to the three Hanbury locks where a couple of lock keepers were on duty to help boaters through - and to make sure that they operated the side ponds (Mike forgot on the first one as he was really thinking about alternative routes as was duly reprimanded!) What we did learn, however, was that by now Diglis locks at Worcester were now closed. This reduced our options from at least four down to one. How easy does that make the choice? We also had to break the bad news to a hire boat that was on their way down the Droitwich to complete the short ring on a four day hire from Worcester.
The morning was tolerably cool and dry but by the time we turned left at Hanbury Junction rain arrived and the temperature dropped markedly for the rest of the day, although the rain was at least intermittent.
It was not long before we arrive at the bottom f the long rise of locks from here to the Birmingham level - although officially they are divided into the Astwood, Stoke and Tardebigge flights. The pounds between the flights are barely different from those in the middle.
At least there was plenty of water coming down the overflows.
Above the Astwood locks we moored up to a new section of bank to have our lunch. Christine was pleased that she had taken time last evening to prepare hearty soup which went some way to warming us up again.
At the bottom end of the Stoke Locks is where the Salt Works once stood. The land has been derelict for a while but a new and large housing development project is underway with considerable works being done to prepare the land. No doubt treatment of the adverse effects of long chemical working will not be straightforward.
We were disappointed to see that the Stoke Works Pump House (which we featured in our blog in 2014) appears to have been completely demolished. We had understood that this was the last remaining building from the once substantial Salt Works and was being preserved.
It was clear that we would not attempt the Tardebigge flight tonight and so we tied up for the night in the pound below Stoke top lock - to avoid being outside the popular pub just above that lock. Even so we had to be careful about the boat leaning at an angle if too many lockfuls of water were taken out.
It was still only just after 3.30 when we were tied up and fire lit so Mike and Christine opted to walk to the nearby Stoke Prior parish church to check out what time there might be a service tomorrow, Easter Day. (All our previous investigations around where we had hoped to be were now irrelevant!) Alas, when we arrived at 4.05 the church was already locked (it is normally open between 10 and 4) and we eventually discovered that tomorrow's service is not until 6 in the evening! Not much help for us.
In the porch is an old wooden cross which is inscribed in memory of Charles steer who was the first chairman of the newly merged company of GKN, having previously been in charge of Nettlefolds which was the last of the companies to join this giant engineering and manufacturing company. Charles Steer established a 'rest home' in Stoke Prior for former employees. A timely reminder given that GKN has only just fallen to a predatory takeover from a firm that specialises in breaking up old established businesses in order to make more profit from them. Ironically, when GKN was originally formed it was the result of various mergers and takeovers during which many workers either lost their jobs or had to move.
4.3 Miles - 14 Locks